Flexibility Reaps Rewards In Fast-Changing DSR Market

Organisations need to adapt to the fast-changing market for demand-side response if they are to take full advantage of the opportunities available. Graham Oxley, ENGIE's Managing Director of Energy with Services, explains

The market for demand-side response (DSR) services is changing fast. Lower prices for many National Grid services mean that previously lucrative options now offer significantly lower returns. The growth in intermittent renewable generation and a greater reliance on Continental interconnectors to supply the UK’s energy mean that response services need to be faster than ever, with National Grid trying hard to attract a wider range of participants. At the same time, a flattening of Distribution Use of System (DUoS) and other charges has significantly reduced the returns offered by Triad avoidance and reduced the incentive for load shedding during peak periods.

All of this means that businesses need to be more adaptable and creative than ever to optimise the revenue-generating benefits of DSR participation. Making money from these services is still possible, but it requires a detailed knowledge of the opportunities available and a finger on the pulse of this fast-changing marketplace.

Widening the appeal of frequency response

Major changes are taking place in the frequency response market. Frequency response services enable National Grid to maintain second-by-second control over electricity demand and generation in order to maintain system frequency within 1% of 50 Hz. The response from participants – whether a reduction in demand or an increase in generation output – needs to be instantaneous to enable National Grid to overcome sudden frequency fluctuations.

The old bilateral Frequency Control by Demand Management (FCDM) service has been phased out in favour of shorter-term auction-based services. The latest of these – Response Auction Trial – was launched in June. It involves weekly auctions for week-long frequency response contracts. Interested participants bid into the auctions for the four-hour EFA periods during the following week in which they wish to make their load available. It’s an extremely flexible service that enables participants to decide on a weekly basis when they want to take part – or at least bid into the auction. Previous versions of frequency response required participants to predict their demand-management or generation capabilities months in advance. By offering a weekly option, National Grid hopes to appeal to a wider range of customers that can more easily forecast their short-term availability for the week ahead.

The service is on a two-year trial, with further modifications in the pipeline. Currently, when participants are triggered to respond, they must maintain their response for 30 minutes. National Grid wants to offer shorter response periods, of ten or even five minutes. It also wants to trial day-ahead and even within-day auctions over the next three years. For participants, the problem of an auction-based system is that there are no guarantees of securing a contract each week – unlike previous longer-term bilateral contracts. It adds to the uncertainty around participation in these demand-side services.

Peak avoidance incentives reduced 

Changes in DUoS and other charges are making Triad avoidance a less lucrative option than ever before. Ofgem has proposed changing the rules for Triad import charges so that instead of being based on how much energy a business consumes during these peak periods, they are based on the amount of capacity connected to the grid. This would mean the same flat rate charge would apply to a given business, regardless of how much it consumed during Trial periods. Consequently, there will be no incentive for businesses to reduce demand during Triads. As a result, National Grid must find different ways to incentivise businesses to load-shed during peak periods, to avoid significant constraints on the network.

Emissions regulations limit STOR capacity

Participation in demand-side reserve services is also under pressure. The Medium Combustion Plant Directive (MCPD) introduced in late 2018 set out sulphur dioxide (SO2), nitrogen oxide (NOX) and dust emission limits for generators smaller than 50W (rated thermal input). Most diesel generators exceed these NOx limits, and costly modifications are required to clean them up.

By January 2019, diesel generators that did not comply with the NOx emissions threshold were barred from participation in National Grid DSR services. The necessary modification costs for diesel generators are around £60,000/MW – far more than a generator can earn through DSR participation – so many businesses opted not to invest in the modifications. This has had a major impact on the DSR market, particularly short-term operating reserve (STOR), which relies heavily on the participation of medium-sized responsive generators.

STOR prices plummet

STOR remains an important service for National Grid. It is often the entry point for businesses considering DSR participation. The notice period for any response is 20 minutes, giving participants the opportunity to test their load-management capabilities while earning both availability and utilisation fees. However, the popularity of the service means it is heavily oversubscribed, and prices for participation have plummeted in recent years. Some participants even offer their capacity for free, which has significantly depressed revenue-earning possibilities through this service.

Other opportunities, such as the Capacity Market, have also been impacted by changes in the market and by the emergence of improved battery technology, which reduces the need to hold generation assets in reserve. In fact, the Capacity Market has recently been suspended, pending an investigation by the European courts. We remain hopeful that this will be resolved this year.

How to capitalise on the changing DSR market

So, what opportunities remain for businesses keen to use their demand flexibility or spare generation capacity to participate in DSR services?

One option is to stack multiple compatible services, in order to benefit from the multiple payment options on offer. For example, STOR participation can be combined with Capacity Market participation, since both services are very unlikely to be called upon at the same time.

Another option is to look into opportunities offered locally by distribution network operators (DNOs), which are responsible for managing supply and demand in their designated areas. A DNO such as WPD, which manages the network between the Midlands and the south-west, faces considerable constraint issues due to the large number of manufacturing businesses in its region. Such DNOs may offer constraint-management services, similar to STOR, for local businesses to participate in, to help overcome local system constraints at peak times.

Specialist aggregators, like ENGIE, are also looking at opportunities for customers to participate in the wholesale electricity market’s balancing mechanism. Previously, only large-scale generators and energy suppliers could participate in this mechanism, but changes are planned for late 2019. These could open up the balancing mechanism to demand-side participants, offering new opportunities for businesses to generate revenue from their demand flexibility.

Understand your capabilities – and seek specialist support

The message for any business interested in earning revenue from DSR opportunities today is that flexibility is key. Your first priority should be to identify any flexible capacity within your operations. This could be an ability to reduce demand from processes instantaneously, to ramp up generators or to switch to battery power at short notice. Once you have identified your flexible capacity, you need to determine how quickly you are able to respond. Finally, calculate the cost to your business of responding in this way.

Armed with this information, an experienced DSR service provider can go to the market on your behalf to find the optimum opportunities for your business in today’s dynamic and fragmented market. 

Find out more about Demand-Side Response

 

This article was first published in the Energy in Buildings & Industry magazine.

Process flexibility enables CEMEX UK to capitalise on DSR
Find out how DSR works for Yorkshire Water

Required field*

At ENGIE we take your privacy very seriously and will only use your information in accordance with our Privacy Policy. From time to time we would like to contact you with details on our products and services that we think may be of interest. Please tick the box below to confirm that you are happy for us to contact you by email: